1. Disassembly and steps of automobile engine disassembly of engine body components 1) Remove the fixing screw of the cylinder head, and pay attention to the screws should be from both ends Cross and loosen in the middle, and remove the screw in 3 times.2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. Disassembly steps: To remove the external components of the aircraft, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
4. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil span, and loosen the engine oil span.
1. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. The disassembly and installation method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times;Lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil sup, and release the engine oil sup.
4. The engine disassembly steps are carried out in the order of machine, assembly, parts, assembly and parts. Pay attention to proofreading the assembly mark when disassembling to ensure that it can be reassembled as it is. When disassembling various threaded connectors, it should be disassembled in a professional symmetrical order to ensure the complete disassembly of the threaded connectors.
5. Remove the front mask and baffle of the engine. First, loosen the six nuts fixing the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
6. Remove it in the gearbox bodyDismount assembly: First remove the clutch cover and the flywheel connection bolt, and then move the detacher up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
Fix the bolt under the shock absorber after removing it. Remove the two M10×55 engine suspension bracket bolts, pull the engine back together with the rear wheel and remove it. Remove the ignition coil from the engine suspension bracket, remove the engine mounting bolt M10×185 nut, remove the engine suspension assembly, and remove the engine assembly.
First, remove the battery ground wire, drain the coolant, remove the mask and baffle, remove the pipelines such as oil pipes, and remove the flywheel cover.Put it back in the opposite direction. The specific steps are as follows: remove the battery ground wire to avoid accidental damage to the electrical equipment. Adjust the empty switch to the "warm air" position to ensure that the coolant can be completely discharged.
Turn the crankshaft to put the engine's 4-cylinder piston at the lower stop. Remove the fastening nuts of the connecting rod of the 4-cylinder respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassemble the engine crankshaft flywheel group, loosen the flywheel to fasten the screw, disassemble the flywheel, the flywheel is relatively heavy, pay attention to safety when disassembly.Remove the front and rear sealing flanges and oil seals of the crankshaft.
The process of removing from the engine rack: (1) Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cords and wires on the generator.Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
First, remove the fuel supply system, ignition system, cooling system and other system-related parts from the engine, so as to disassemble the cylinder block crankcase group. Remove the cylinder head cover, remove the camshaft, etc. to facilitate the removal of the cylinder head.
The engine disassembly process of mechanical assembly is roughly as follows: place the engine upright, remove the inlet and exhaust manifolds and the cylinder head outlet pipes. Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump;Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
How to integrate IoT with trade data-APP, download it now, new users will receive a novice gift pack.
1. Disassembly and steps of automobile engine disassembly of engine body components 1) Remove the fixing screw of the cylinder head, and pay attention to the screws should be from both ends Cross and loosen in the middle, and remove the screw in 3 times.2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. Disassembly steps: To remove the external components of the aircraft, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
4. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil span, and loosen the engine oil span.
1. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. The disassembly and installation method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times;Lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil sup, and release the engine oil sup.
4. The engine disassembly steps are carried out in the order of machine, assembly, parts, assembly and parts. Pay attention to proofreading the assembly mark when disassembling to ensure that it can be reassembled as it is. When disassembling various threaded connectors, it should be disassembled in a professional symmetrical order to ensure the complete disassembly of the threaded connectors.
5. Remove the front mask and baffle of the engine. First, loosen the six nuts fixing the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
6. Remove it in the gearbox bodyDismount assembly: First remove the clutch cover and the flywheel connection bolt, and then move the detacher up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
Fix the bolt under the shock absorber after removing it. Remove the two M10×55 engine suspension bracket bolts, pull the engine back together with the rear wheel and remove it. Remove the ignition coil from the engine suspension bracket, remove the engine mounting bolt M10×185 nut, remove the engine suspension assembly, and remove the engine assembly.
First, remove the battery ground wire, drain the coolant, remove the mask and baffle, remove the pipelines such as oil pipes, and remove the flywheel cover.Put it back in the opposite direction. The specific steps are as follows: remove the battery ground wire to avoid accidental damage to the electrical equipment. Adjust the empty switch to the "warm air" position to ensure that the coolant can be completely discharged.
Turn the crankshaft to put the engine's 4-cylinder piston at the lower stop. Remove the fastening nuts of the connecting rod of the 4-cylinder respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassemble the engine crankshaft flywheel group, loosen the flywheel to fasten the screw, disassemble the flywheel, the flywheel is relatively heavy, pay attention to safety when disassembly.Remove the front and rear sealing flanges and oil seals of the crankshaft.
The process of removing from the engine rack: (1) Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cords and wires on the generator.Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
First, remove the fuel supply system, ignition system, cooling system and other system-related parts from the engine, so as to disassemble the cylinder block crankcase group. Remove the cylinder head cover, remove the camshaft, etc. to facilitate the removal of the cylinder head.
The engine disassembly process of mechanical assembly is roughly as follows: place the engine upright, remove the inlet and exhaust manifolds and the cylinder head outlet pipes. Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump;Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
HS code classification for electronics
author: 2024-12-24 02:45Biotech imports HS code classification
author: 2024-12-24 02:42HS code correlation with duty rates
author: 2024-12-24 02:30How to simplify multi-leg shipments
author: 2024-12-24 01:55How to analyze competitor shipping routes
author: 2024-12-24 01:14Cross-border HS code harmonization
author: 2024-12-24 02:35Industrial equipment HS code alignment
author: 2024-12-24 01:53How to align trade data with demand planning
author: 2024-12-24 01:26343.44MB
Check479.11MB
Check847.27MB
Check762.14MB
Check989.93MB
Check212.59MB
Check975.15MB
Check575.89MB
Check993.96MB
Check767.99MB
Check287.92MB
Check845.96MB
Check273.33MB
Check839.73MB
Check586.64MB
Check411.25MB
Check761.79MB
Check576.63MB
Check252.79MB
Check691.56MB
Check493.84MB
Check393.16MB
Check817.27MB
Check181.89MB
Check238.37MB
Check741.54MB
Check476.29MB
Check225.59MB
Check682.94MB
Check276.36MB
Check273.48MB
Check911.11MB
Check673.27MB
Check168.88MB
Check277.25MB
Check666.17MB
CheckScan to install
How to integrate IoT with trade data to discover more
Netizen comments More
978 Supplier relationship management with trade data
2024-12-24 03:08 recommend
2547 customs data reports
2024-12-24 02:29 recommend
2087 How to adapt to shifting trade policies
2024-12-24 01:59 recommend
2694 Comprehensive customs data libraries
2024-12-24 01:36 recommend
1006 HS code-focused compliance audits
2024-12-24 00:44 recommend