After removing all the bolts and nuts, knock on the circumference of the cylinder head with a wooden hammer to lift them up, and then use a disassembly tool to put them into the valve duct holes at both ends of the cylinder head or remove them smoothly by hand.Note that it is not allowed to insert the cylinder head to avoid damaging the cylinder pad.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively. (3) Use sharp-nosed pliers to remove the valve lever oil seal.
Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust air.Manifold, remove the cylinder hood, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically disassembled.
Remot the front mask and baffle of the engine. First, loosen the six nuts that fix the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
Remantle the disener assembly in the gearbox body: first remove the clutch cover and the flywheel connection bolt, and then move the disener up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
At the auto show, the engineer once said, A single cylinder can be opened and closed in 14 milliseconds, completing the transition from three cylinders to two cylinders. Therefore, I am still very interested in this engine. Some time ago, I came to the engine factory of Chongqing Ford Motor Company for the first time to disassemble this engine.Through disassembly, I found a lot of interesting points.
Put the engine sideways and check whether there are marks on the clutch cover and flywheel. If there is no mark, it should be made up. Then turn the crankshaft flywheel, remove the eight clutch fixing bolts symmetrically and evenly around the clutch cover, and remove the clutch assembly.
The cylinder block is an important part of the engine, which is equivalent to the brain of the engine. It organizes and installs various parts of the engine and has the effect of regulating the temperature. The power of the engine is transmitted by the sealing function of the cylinder block and the cylinder head.
And we are also surprised to find that Japan, which is also the top of the world's automobile industry, never seems to mention this technology. In many disassembly videos, we can still see that Japanese manufacturers are using traditional connecting rod parts.
Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover and the rocker arm shaft assembly on the front and rear cylinder heads;Remove the crankshaft ventilation pipe, remove the bar chamber cover; remove the putter.
First, unscrew the external screw, and then remove the transmission shell to observe the installation position of the transmission and the connection with the engine.
Unplug the dual-temperature switch of the radiator and the connection plug of the electric fan. Loosen the engine hatch lock cable clip and pull out the cable from the top of the radiator. Remove the front mask and baffle of the engine. First, loosen the six nuts that fix the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively.(3) Use sharp-nosed pliers to remove the valve lever oil seal.
Trade compliance automation tools-APP, download it now, new users will receive a novice gift pack.
After removing all the bolts and nuts, knock on the circumference of the cylinder head with a wooden hammer to lift them up, and then use a disassembly tool to put them into the valve duct holes at both ends of the cylinder head or remove them smoothly by hand.Note that it is not allowed to insert the cylinder head to avoid damaging the cylinder pad.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively. (3) Use sharp-nosed pliers to remove the valve lever oil seal.
Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust air.Manifold, remove the cylinder hood, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically disassembled.
Remot the front mask and baffle of the engine. First, loosen the six nuts that fix the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
Remantle the disener assembly in the gearbox body: first remove the clutch cover and the flywheel connection bolt, and then move the disener up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
At the auto show, the engineer once said, A single cylinder can be opened and closed in 14 milliseconds, completing the transition from three cylinders to two cylinders. Therefore, I am still very interested in this engine. Some time ago, I came to the engine factory of Chongqing Ford Motor Company for the first time to disassemble this engine.Through disassembly, I found a lot of interesting points.
Put the engine sideways and check whether there are marks on the clutch cover and flywheel. If there is no mark, it should be made up. Then turn the crankshaft flywheel, remove the eight clutch fixing bolts symmetrically and evenly around the clutch cover, and remove the clutch assembly.
The cylinder block is an important part of the engine, which is equivalent to the brain of the engine. It organizes and installs various parts of the engine and has the effect of regulating the temperature. The power of the engine is transmitted by the sealing function of the cylinder block and the cylinder head.
And we are also surprised to find that Japan, which is also the top of the world's automobile industry, never seems to mention this technology. In many disassembly videos, we can still see that Japanese manufacturers are using traditional connecting rod parts.
Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
Disassembly steps: To remove the external components of the fuselage, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover and the rocker arm shaft assembly on the front and rear cylinder heads;Remove the crankshaft ventilation pipe, remove the bar chamber cover; remove the putter.
First, unscrew the external screw, and then remove the transmission shell to observe the installation position of the transmission and the connection with the engine.
Unplug the dual-temperature switch of the radiator and the connection plug of the electric fan. Loosen the engine hatch lock cable clip and pull out the cable from the top of the radiator. Remove the front mask and baffle of the engine. First, loosen the six nuts that fix the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3.
Steps for disassembly and installation of automobile engine valve group Disassembly of automobile engine valve group (1) Remove the valve adjustment gasket. (2) Remove the inlet and exhaust doors. Use valve disassembly pliers to compress the valve spring, and remove the lock, spring seat, valve spring and valve successively.(3) Use sharp-nosed pliers to remove the valve lever oil seal.
Industry consolidation via HS code data
author: 2024-12-23 23:05HS code-driven route-to-market planning
author: 2024-12-23 23:03Data-driven supply chain partnerships
author: 2024-12-23 22:52HS code analytics for port efficiency
author: 2024-12-23 22:25Holistic international trade reports
author: 2024-12-23 21:38Non-GMO products HS code classification
author: 2024-12-23 23:44Top supply chain intelligence providers
author: 2024-12-23 23:26Textile supply chain HS code mapping
author: 2024-12-23 23:22551.56MB
Check965.83MB
Check319.43MB
Check226.63MB
Check178.85MB
Check584.95MB
Check797.33MB
Check774.81MB
Check152.66MB
Check986.98MB
Check361.47MB
Check662.26MB
Check298.15MB
Check679.44MB
Check394.89MB
Check388.82MB
Check323.95MB
Check885.78MB
Check832.31MB
Check381.84MB
Check745.44MB
Check565.39MB
Check317.16MB
Check816.27MB
Check993.34MB
Check845.24MB
Check887.82MB
Check286.57MB
Check242.13MB
Check447.23MB
Check774.95MB
Check368.49MB
Check989.73MB
Check386.21MB
Check517.92MB
Check446.33MB
CheckScan to install
Trade compliance automation tools to discover more
Netizen comments More
2117 HS code-based supply risk mitigation
2024-12-23 23:49 recommend
2928 HS code categorization for finished goods
2024-12-23 23:12 recommend
1058 How to measure trade KPIs
2024-12-23 23:05 recommend
302 HS code-based vendor qualification
2024-12-23 22:06 recommend
1348 Industrial lubricants HS code classification
2024-12-23 21:18 recommend